Control variable #1
Peak T is not the only T that matters

Pyrolysis Yield

Temperatures

Map100 °C → 1100 °C+

Direct answer

What temperature should pyrolysis run at?

For oil, 450–550 °C with a cold quench. For char, 400–600 °C and stay there. For battery binder, 500–700 °C after a 100–300 °C dry. For PFAS leaving solids, ≥400–500 °C is the start; for PFAS mineralisation in gas, plan ≥850–950 °C with hydrogen donors. For asbestos fibres, plan 900–1100 °C hold, not a 600 °C kiln tour.

°CWhat happensUseDo not expect
60–120Free moisture, some electrolyte solventsDrying, vacuum solvent recoveryPyrolysis
150–250Hydrothermal TFA decarboxylation (with alkali for F)TFA in waterDry pyrolysis of sludge
180–300LIB carbonate electrolytes crack; LiPF6 → HF if wetVacuum dry preferredSafe open-air heating of cells
200–300TorrefactionSolid fuel, grindabilityOil, PFAS kill
350–450Onset of polymer and biomass depolymerisationVacuum tire oilComplete conversion of all polymers
400PFAS leave sludge solids in lab (≥99.6% of 24 PFAS in sand matrix)Minimum for “PFAS off char”Mineralisation; gas still loaded
420–540PVDF binder decomposes (HF, fluorocarbons)Black-mass pretreatmentZero fluorine emissions
450–550Sweet spot for plastic and biomass liquids; tire oil maxMost oil plantsPFAS mineralisation
500–630Carbothermal reduction of NMC/NCA; Li → Li2CO3/Li2OSelective Li leachSmelting recoveries of Ni/Co
600Municipal sludge pyrolysis + NCA Li optimum in one study; chrysotile dehydroxylation startsPYREG-class, battery kilnAsbestos fibre gone
650–800More gas, less oil; chrysotile XRD fades; fibres may remainChar polishing, some ACM researchOil maximisation
700–800Parent PFAS gas-phase headgroup loss; PIDs remainFirst destruction, not lastCF4-free stack
850–950Thermal treatment ~99.99% parent PFAS in some combustors; 1H-perfluoroalkane bottleneck ~950 °C, 2 sPyrolysis-gas oxidiserZero PIDs if starved of H
≥950–1100More complete C–F mineralisation; asbestos → forsterite/enstatiteIncineration, ACM inertingA pyrolysis-oil business case
1500Battery pyrometallurgy / EnAM slag workAlloy + slag, not pyrolysisLi in metal; Li reports to slag

Hold time

Battery PVDF: 15 min at 650 °C can work with casing intact; 1–3 h is common at 450–550 °C. Sludge PFAS-off-char: minutes at 600 °C in PYREG-class units, but the oxidiser is the destruction step. Asbestos: 30 min at 800 °C completed mass-loss in one cement-asbestos kinetic study; fibre morphology studies still ask for ≥900 °C / 2 h. Do not mix those papers.

How to control and abate at these temperatures →